Preventing automatic failover
Hi there,
Is there any way of preventing a CCR cluster to failover automatically?A client wants to have control over the failover process.
Regards,
Mark
September 6th, 2007 11:00am
Hi,
CCR support Scheduled and Unscheduled Outages, what does this means ? check this Technet link:
http://technet.microsoft.com/en-us/library/aa998584.aspx
well , if you want to changed this nature, i think you will end up with problems in syncing the Log Files between the two nodes.
anyone has another idea ? i think you should not allow for manual failover for CCR specially, due to the nature of Log shipping of the Log files between the two nodes, this is from my point of view.
Regards
Alaa
Free Windows Admin Tool Kit Click here and download it now
September 6th, 2007 9:50pm
Cluster service will do a fail over in case of something is failing. Either build your system reduntant and cluster service does not need to fail over.
If you really want to control this manually, then wait for SCR. Its coming in Exchange 2007 SP1. With SCR you manually controleverything
.
September 6th, 2007 9:56pm