I am currently in the process of migrating our backups to DPM 2012. I set up a protection group and moved 6 servers onto it the first night and all the jobs ran successfully. The second day I modified the protection group and added a further 20 servers to it. The backup jobs added are mostly just disk volumes and system state protection. Just after midnight, a lot of the jobs failed with this error:
Type: Tape backup
Status: Failed
Description: The job was cancelled because the user modified the associated protection group. (ID 33342)
More information
End time: 25/07/2012 12:05:01 a.m.
Start time: 25/07/2012 12:04:57 a.m.
Time elapsed: 00:00:03
Data transferred: 0 MB
Cluster node -
Source details: xxxxxxx\xxxx
Protection group: xxxxxxxx
Library: IBM TotalStorage 3573 Tape Library
Tape Label (Barcode): -
I certainly wasn't modifying the protection group at the time. The modification was done early in the afternoon and the protection group was scheduled to start backup at 11:00pm. Has anyone else seen this error before?