I've recently setup DPM 2012R2 to backup a few machines to Azure for long term retention, however when I check the DPM Management tab the Online Status shows as no space being used
However the Azure portal shows capacity being used along with Storage entries for both VM's being backed up
Backups have been running for only a few days, is this something that just needs time to matriculate down to the DPM server, or is there a problem? If so what needs to be done to correct the status?