I am new to DPM.
We have configured a protection group for short term goal with 7 days retention range, Synchronization frequency 6 hours. And recovery points are based on synchronization (means 4 Recovery points per day and DPM will have 28 valid restore points after a week...!!??). In long term goals we have configured 2 recovery goals to tape ... 1 recovery point per week on saturday (retention 4 weeks) and 1 recovery point per month (on day 1 with retention range of 1 month).
Now Im getting PG status "backup to Tape failed" I want to know the process how DPM will check and verify recovery points on disk before writing them to tape.
Based on my protection group settings, there should be 4 recovery points on disk everyday. but there is something different result...see the below in reply.
My queries are:
1) On Saturday weekly tape job, does it require DPM to have valid 28 Recovery points?? What happen if any RP missing.
2) Due to some issues, if weekely tape backup failed on saturday. Can we resume it on monday,tuesday..with corrective actions??
3) the DPM process of verifying disk based recovery points before writing them to tape.
- Edited by Vijay MC Friday, January 03, 2014 2:38 PM